SY 2026–2027 · REVISED K TO 10
Curriculum map
Browse the Three-Term Budget of Work by grade, term, and week.
GRADE 8 · OPENING UNIT
Measures of centre
Make sense of data with the mean, median and mode.
Term 3 content and performance standards
Content standards
- linear equations in two variables and their graphs
- systems of linear equations in two variables
- linear inequalities in two variables
- measures of variability for ungrouped data
- interpretation and analysis of graphs from primary and secondary data
- experimental and theoretical probability
- the Fundamental Counting Principle
Performance standards
- graph linear equations in two variables.
- solve a system of linear equations graphically and algebraically.
- use linear inequalities in two variables in the solution of problems.
- calculate measures of variability for ungrouped data.
- interpret and analyze graphs from primary and secondary data.
- determine the number of possible outcomes of an experiment using the Fundamental Counting Principle.
- calculate the probability of a single event and the probability of simple combined events.
Week 1
Number and Algebra
Define and illustrate a system of linear equations in two variables.
Budget of Work · p. 7Number and Algebra
Solve a system of linear equations (with integer solutions) by graphing.
Budget of Work · p. 7Weeks 2–4
Number and Algebra
Classify the types of systems of linear equations based on the number of solutions.
Budget of Work · p. 8Number and Algebra
Solve algebraically a system of linear equations in two variables.
Budget of Work · p. 8Number and Algebra
Solve problems involving systems of linear equations in two variables.
Budget of Work · p. 8Week 5
Number and Algebra
Recognize and solve problems involving linear inequalities in two variables.
Budget of Work · p. 8Week 6
Data and Probability
Calculate the measures of variability (range, mean deviation, and standard deviation) for ungrouped data.
Budget of Work · p. 8Data and Probability
Draw conclusions from statistical data using the measures of variability.
Budget of Work · p. 8Data and Probability
Source: [G8] Mathematics.pdf · Three-Term Budget of Work · 17 April 2026. Page numbers follow the printed source.